Full Operational Health Check
A wider assessment of the complete site and its operational controls
The Full Operational Health Check provides a broader review of the site, its processing operations and the systems used to control production.
It is designed for larger or more complex operations where the issues cannot be understood by looking at a single line in isolation. This may include multiple production areas, stock and material flow, maintenance, reporting, quality control and management routines.
Because sites vary significantly in size and complexity, each Full Operational Health Check is individually scoped following an initial discussion and, where appropriate, a preliminary site visit.
Typical areas reviewed
Material receipt and acceptance
Storage, bay control and site organisation
Material flow between processing stages
Multiple processing lines and production areas
Production planning and scheduling
Input, output and yield reporting
Stock control and reconciliation
Downtime and maintenance systems
Quality control and batch traceability
Supplier out-turn and purchasing evidence
Operator, supervisor and management routines
Shift handovers and communication
Traffic flow, loading and dispatch
Finished-product control
Site-wide dust, spillage and housekeeping issues
Operational and compliance gaps
CAPEX priorities and improvement planning
Typical output
Full operational findings report
Findings grouped by site area, process or business function
Photographic evidence
Priority assessment based on risk, operational effect and likely return
Immediate actions and critical issues
Medium and longer-term improvement plan
Process-control and reporting recommendations
CAPEX priorities
30, 60 and 90-day roadmap where suitable
Management presentation and follow-up review
Best suited to
Multi-line recycling and processing sites
Businesses preparing for significant growth
Operations experiencing poor control as production increases
Sites with stock, yield or reporting weaknesses
Businesses facing recurring maintenance and production problems
New owners or investors seeking an independent operational view
Larger recycling groups requiring focused site-level support
Businesses developing a structured improvement programme
Typical duration
Individually scoped.
A full review may require several site visits, data analysis, interviews, observation across different shifts and several days of off-site reporting. Larger sites may require five to ten or more days on site depending on the agreed scope.

