Full Operational Health Check

A wider assessment of the complete site and its operational controls

The Full Operational Health Check provides a broader review of the site, its processing operations and the systems used to control production.

It is designed for larger or more complex operations where the issues cannot be understood by looking at a single line in isolation. This may include multiple production areas, stock and material flow, maintenance, reporting, quality control and management routines.

Because sites vary significantly in size and complexity, each Full Operational Health Check is individually scoped following an initial discussion and, where appropriate, a preliminary site visit.

Typical areas reviewed

  • Material receipt and acceptance

  • Storage, bay control and site organisation

  • Material flow between processing stages

  • Multiple processing lines and production areas

  • Production planning and scheduling

  • Input, output and yield reporting

  • Stock control and reconciliation

  • Downtime and maintenance systems

  • Quality control and batch traceability

  • Supplier out-turn and purchasing evidence

  • Operator, supervisor and management routines

  • Shift handovers and communication

  • Traffic flow, loading and dispatch

  • Finished-product control

  • Site-wide dust, spillage and housekeeping issues

  • Operational and compliance gaps

  • CAPEX priorities and improvement planning

Typical output

  • Full operational findings report

  • Findings grouped by site area, process or business function

  • Photographic evidence

  • Priority assessment based on risk, operational effect and likely return

  • Immediate actions and critical issues

  • Medium and longer-term improvement plan

  • Process-control and reporting recommendations

  • CAPEX priorities

  • 30, 60 and 90-day roadmap where suitable

  • Management presentation and follow-up review

Best suited to

  • Multi-line recycling and processing sites

  • Businesses preparing for significant growth

  • Operations experiencing poor control as production increases

  • Sites with stock, yield or reporting weaknesses

  • Businesses facing recurring maintenance and production problems

  • New owners or investors seeking an independent operational view

  • Larger recycling groups requiring focused site-level support

  • Businesses developing a structured improvement programme

Typical duration

Individually scoped.

A full review may require several site visits, data analysis, interviews, observation across different shifts and several days of off-site reporting. Larger sites may require five to ten or more days on site depending on the agreed scope.

Previous
Previous

Processing Line Performance Audit