Processing Line Performance Audit

A detailed review of one complete processing line

The Processing Line Performance Audit is a structured, in-depth assessment of a single defined production line and the equipment, people and controls that support it.

Rather than reviewing individual machines in isolation, the audit looks at how the complete line operates from infeed through to finished outputs and waste streams. It considers whether each process stage is supporting the next and where throughput, recovery, quality or availability may be being lost.

The scope is agreed in advance so the line can be properly assessed within the allocated time.

Typical areas reviewed

  • Process flow from infeed to final outputs

  • Throughput and plant utilisation

  • Yield, recovery and material losses

  • Feed presentation and material distribution

  • Equipment settings and process stability

  • Shredding, granulation and screening performance

  • Air, density and sensor-based separation

  • Product quality and contamination

  • Re-runs, middlings and oversize generation

  • Downtime and recurring breakdowns

  • Maintenance condition and critical components

  • Operator routines, access levels and process changes

  • Dust extraction, spillages and retained material

  • Production data and performance visibility

  • Bottlenecks and improvement opportunities

Examples of suitable lines

  • Shredder and downstream separation line

  • ECS and screening line

  • Cable-granulation line

  • WEEE processing line

  • Density-separation process

  • Optical or sensor-sorting line

  • Picking and sorting operation

  • Fine-metal recovery process

  • Aluminium or copper granulation line

Typical output

  • Detailed photographic findings report

  • Findings arranged by process stage or equipment area

  • Priority classification

  • Immediate, medium-term and longer-term actions

  • Assessment of throughput, recovery and process-control gaps

  • Commercial impact where it can be reasonably evidenced

  • Recommended trials, repairs or equipment changes

  • Structured improvement roadmap

  • Follow-up meeting

Best suited to

  • A line that is not reaching expected throughput

  • Inconsistent recovery or product quality

  • Excessive downtime or recurring faults

  • High levels of re-run or middling material

  • Increasing waste or metallic losses

  • A line that has grown or changed over time

  • A business considering replacement or additional CAPEX

  • A site requiring independent evidence before involving an OEM

Typical duration

Usually two to four days on site, plus off-site analysis and report preparation.

The exact duration depends on the number of process stages, operating shifts, available data and whether production trials are required.